"/>

国产精品99一区二区三_免费中文日韩_国产在线精品一区二区_日本成人手机在线

India's indigenous light transport aircraft completes 2nd test-flight
Source: Xinhua   2018-02-21 23:00:03

NEW DELHI, Feb. 21 (Xinhua) -- India's indigenously built light transport aircraft SARAS has been successfully test flown for a second time Wednesday, officials said.

The officials from India's ministry of science and technology said the flight took off from state-owned aerospace and defence company - Hindustan Aeronautics Limited (HAL) airport in Bengaluru for a text book flight.

"This was the second of the 20 test flights planned for SARAS PT1N, before freezing the production version," a government spokesman said.

The first successful test was carried out last month.

The design and development of the aircraft is being done by India's Council of Scientific and Industrial Research (CSIR)- National Aerospace Laboratories (NAL).

"The project was dumped by the previous government, after an accident during test flight in 2009. Though the Directorate General of Civil Aviation (DGCA) had exonerated the aircraft from any design flaw or poor-quality production, no effort was made to revive the project," said Harsh Vardhan, India's minister for Science and Technology. "The credit for reviving the indigenous project goes to the present government headed by Narendra Modi."

The production model design, according to NAL, is expected to be ready by June-July this year, officials said.

Editor: Mu Xuequan
Related News
Xinhuanet

India's indigenous light transport aircraft completes 2nd test-flight

Source: Xinhua 2018-02-21 23:00:03
[Editor: huaxia]

NEW DELHI, Feb. 21 (Xinhua) -- India's indigenously built light transport aircraft SARAS has been successfully test flown for a second time Wednesday, officials said.

The officials from India's ministry of science and technology said the flight took off from state-owned aerospace and defence company - Hindustan Aeronautics Limited (HAL) airport in Bengaluru for a text book flight.

"This was the second of the 20 test flights planned for SARAS PT1N, before freezing the production version," a government spokesman said.

The first successful test was carried out last month.

The design and development of the aircraft is being done by India's Council of Scientific and Industrial Research (CSIR)- National Aerospace Laboratories (NAL).

"The project was dumped by the previous government, after an accident during test flight in 2009. Though the Directorate General of Civil Aviation (DGCA) had exonerated the aircraft from any design flaw or poor-quality production, no effort was made to revive the project," said Harsh Vardhan, India's minister for Science and Technology. "The credit for reviving the indigenous project goes to the present government headed by Narendra Modi."

The production model design, according to NAL, is expected to be ready by June-July this year, officials said.

[Editor: huaxia]
010020070750000000000000011105091369895061
主站蜘蛛池模板: 惠安县| 贵州省| 通州区| 长乐市| 巴楚县| 黄平县| 南平市| 常德市| 泰和县| 永济市| 湛江市| 句容市| 云霄县| 乐至县| 新巴尔虎左旗| 如皋市| 儋州市| 奉化市| 方城县| 堆龙德庆县| 广安市| 江华| 南漳县| 银川市| 苏州市| 闵行区| 临泉县| 汝阳县| 海宁市| 牙克石市| 四平市| 云和县| 无极县| 岳普湖县| 墨江| 开远市| 大丰市| 锦屏县| 长乐市| 竹山县| 花莲市|